
Trek
Epic Kilimanjaro — 7-Day Machame Route
Seven days on the mountain by the Machame route, plus the nights either side. The extra day at Karanga is the one that gets most people to the top.
- Duration
- 9 days
- Starts
- Kilimanjaro International Airport (JRO)
- Ends
- Kilimanjaro International Airport (JRO)
- Best months
- January to March, and June to October
- Pace
- Hard
- Per vehicle
- Up to 12
Seven days on the mountain by the Machame route, plus the nights either side. The extra day at Karanga is the one that gets most people to the top.
Why the route is shaped this way
Seven days, not six
The extra night at Karanga is the single biggest factor in summit success. Six-day Machame itineraries exist because they are cheaper, not because they work better.
Walk high, sleep low
The Machame profile does this naturally at Lava Tower and Barranco. We keep the pace slow enough for it to count.
Guides who turn people around
Our lead guides carry a pulse oximeter and the authority to end a climb. Nobody is talked up a mountain they should be coming down.
A proper team
Mountain crew paid to KPAP guidelines, fed properly and equipped properly. The climb is on their backs.
Day by day
A starting point. Every day here can be moved, lengthened or dropped.
Arrive in Arusha
Arusha
Airport transfer and a kit check with your lead guide. Anything missing can be hired in Moshi the same evening.
Overnight · Lodge in Arusha, bed and breakfast
Machame Gate to Machame Camp
1,800 m to 2,835 m
Registration at the gate, then five to seven hours climbing through rainforest. Wet underfoot most of the year. Camp is in the trees.
Overnight · Machame Camp, full board
Machame to Shira
2,835 m to 3,750 m
Out of the forest and onto the moorland. Four to six hours, with Kibo in front of you most of the way and the Shira Plateau opening out at the end.
Overnight · Shira Camp, full board
Shira to Lava Tower to Barranco
3,750 m to 3,900 m
The classic acclimatisation day. Up to 4,630 m at Lava Tower for lunch, then down to Barranco to sleep lower than you climbed. Most people feel the altitude here for the first time.
Overnight · Barranco Camp, full board
The Barranco Wall to Karanga
3,900 m to 3,995 m
The wall looks worse than it is — scrambling, hands occasionally, no ropes. Four hours to Karanga, arriving early. The afternoon is deliberately idle.
Overnight · Karanga Camp, full board
Karanga to Barafu
3,995 m to 4,673 m
A short, steep three to four hours to base camp across the alpine desert. Early dinner, kit laid out, and sleep from about seven.
Overnight · Barafu Camp, full board
Summit night, and down to Mweka
4,673 m to 5,895 m to 3,100 m
Up around midnight. Six to eight hours in the dark and the cold to Stella Point, then the last hour along the rim to Uhuru Peak at 5,895 m. Down to Barafu for a rest, then on to Mweka. The longest day of your life.
Overnight · Mweka Camp, full board
Mweka Gate and down to Arusha
3,100 m to 1,400 m
Three hours down through the forest to the gate, certificates, and the drive back. The first shower is memorable.
Overnight · Lodge in Arusha, bed and breakfast
Home
Arusha
Transfer to the airport, or straight on to a safari or Zanzibar if you have added one.
Worth knowing before you book
What it costs
| Group | Per person | Notes |
|---|---|---|
| 1 traveller | 3770 | Sole use of the vehicle and guide. |
| 2 travellers | 2750 | Sharing a twin or double room. |
| 3 travellers | 2490 | Sharing one vehicle. |
| 4+ travellers | 2329 | Our published from-rate. |
Indicative from-rates outside peak weeks. Park fees and camp rates move with the season, so your written quote is the figure that counts — and nothing is payable until you ask us to confirm.
What is included
- Private airport transfers
- Kilimanjaro National Park entry, camping and rescue fees
- A KPAP-compliant mountain crew: lead guide, assistant guides, cook and porters
- All meals on the mountain and drinking water
- Sleeping tent, mess tent, table and chairs, and a portable toilet
- Oximeter checks twice daily and an emergency oxygen cylinder
- Two nights in Arusha on bed and breakfast
- Flying Doctors emergency evacuation cover
- Government taxes on included services
What is not
- International flights
- Tanzania visa
- Travel insurance covering trekking to 6,000 m (required)
- Personal trekking equipment and sleeping bag (hire available)
- Tips for the mountain crew
- Drinks and meals not listed
- Anything personal in nature
Questions people ask
Is this price final?
It is a from-rate: the lowest we run this route for, at four sharing, outside peak weeks. Camps and park fees move with the season, so your written quote is the figure that counts. Nothing is payable until you ask us to confirm.
Can the route be changed?
Yes, and most are. Add a night, drop a park, swap a camp, slow the driving down. Tell us what you would be sorry to miss and we will rebuild around it.
How fit do I need to be?
For the safari routes, no more than you need for a long car journey on rough roads. The Kilimanjaro climb is a different matter and is marked Hard.
What are the chances of summiting?
On the seven-day Machame route, high — the great majority of our climbers reach Uhuru Peak. The six-day version of the same route is markedly worse, which is why we do not sell it.
Can I hire equipment?
Yes. Sleeping bags, down jackets, boots and poles can all be hired in Moshi and we will check your kit the evening before you start.
At a glance, you will see
- Shira & Barranco camps
- Karanga to Barafu
- Uhuru Peak summit night
Other journeys
If this one is not quite it
Free, and actually free
Tell us the trip. A guide writes the plan.
Two minutes of questions, a draft itinerary within 24 hours, and no payment until you like it. If we think your idea needs changing, we will say so.
No deposit to planReplies within 24 hoursLicensed & bonded




